Click for larger view
Projects: Roadway Improvements
LeJeune Road Corridor Reconstruction
LeJeune Road Northbound Collector Distributor Project
The project consisted of the realignment of LeJeune Road from State Road (SR) 836 to NW 21st Street and construction of an urban arterial section with six lanes, three in each direction. It also included the construction of a two-lane one-way Collector Distributor Road (C-D Road) located just east of the relocated section of LeJeune Road. This C-D Road provides a direct connection from eastbound SR 836 to the Miami Intermodal Center and the Miami International Airport (MIA).
LeJeune Road Southbound Collector Distributor Project
The Collector Distributor Road provides for three-lane one-way frontage traffic connecting existing MIA traffic with SR 836 westbound and LeJeune Road southbound. Construction of this roadway included the connection from NW 12th Street to SR 836 on the south end and NW 18th Street to MIA on the north end.
LeJeune Road Corridor Projects Benefits:
- Provides direct access roads linking SR 836, the Rental Car Center, the Miami Central Station and MIA
- Improves traffic operations on LeJeune Road resulting in reduced traffic congestion
|